Anna Stamm - New York NY 10003 Eugenia Stamm - Fort Lee NJ 07024 Rolan Stamm - Fort Lee NJ 07024
International Classification:
E01C 100
US Classification:
404 72, 404 14, 404 78
Abstract:
A method of reconstructing existing roadway ( ) on order to restore structural integrity of bridge roadway ( ) with minimal disruption of traffic. First elevated roadway ( ), which comprises a plurality of interconnected ramp units and bridging units, is erected in multiple steps by initially erecting an initial portion of roadway ( ) from entrance/exit ramp units ( ) and ( ) with their uppermost ends facing each other. Then repeatedly, during periods of off-peak traffic, until roadway ( ) is erected, performing a step of creating a gap in a previously erected portion of roadway ( ) by moving ramp unit ( ) along roadway ( ), erecting a bridging unit in the gap, and opening an extended portion of roadway ( ) to traffic prior to the next period of peak traffic. Structural integrity of roadway ( ) is then restored by repeatedly closing a number of existing travel lanes to traffic, while rerouting traffic onto the newly erected roadway ( ), and restoring the closed travel lanes without interruption. This method can be used for reconstructing different types of bridges and highways.
Method And Device For Reconstructing Existing Bridges And Highways With Minimal Disruption Of Traffic
Anna Stamm - New York NY, US Eugenia Stamm - Fort Lee NJ, US Rolan Stamm - Fort Lee NJ, US
International Classification:
E01C001/00
US Classification:
404/001000, 404/072000
Abstract:
A method of erecting a new elevated roadway () above an existing roadway () in order to increase traffic capacity and restore structural integrity of bridge roadway () with minimal disruption of traffic. Roadway (), which comprises a plurality of interconnected ramp units and bridging units, is erected in multiple steps by initially erecting entrance/exit ramp units () and () with their uppermost ends facing each other. Then intermittently, during periods of off-peak traffic, creating a gap in a previously erected portion of roadway () by moving ramp unit () along roadway (), erecting a bridging unit in the gap, and opening an extended portion of roadway () to traffic during periods of peak traffic. Structural integrity of roadway () is then restored by repeatedly closing a number of existing travel lanes to traffic, while rerouting traffic onto the newly erected roadway (41), and restoring structural integrity of the closed travel lanes without interruption. This method can be used for reconstructing different types of bridges and highways.
Youtube
Roland Edward Stamm.wmv
I made this video as a tribute to my Popop Stamm. He passed away on Ma...
Category:
People & Blogs
Uploaded:
14 Mar, 2011
Duration:
3m 39s
Backlab-Stamm entdeckt. Kontaktaufnahme am Li...
Backlab am Linzfest um 18 hr im Pavillion. Ein Freitag und 20. Mai Him...
Category:
Music
Uploaded:
12 May, 2011
Duration:
48s
best of vende globe 2008-2009
1 homme, 1 bateau, 1 tour du monde par les 3 caps. Les meilleures imag...
Category:
Sports
Uploaded:
30 Apr, 2010
Duration:
6m 39s
Derniers prparatifs de Roland Jourdain - Vend...
Derniers prparatifs de Roland Jourdain sur Veolia Environnement- Vende...
Category:
Sports
Uploaded:
22 Oct, 2008
Duration:
1m 38s
Jour 4 : Route du Rhum Franck Cammas et Rolan...
Au quatrime jour de course Joris De Carlan se doit d'abandonner la Rou...
Category:
Sports
Uploaded:
05 Nov, 2010
Duration:
2m 36s
Toccata alla Celtica von Hans-Andr Stamm
Silvesterkonzert Orgel: Susanne Philipp Hackbrett: Roland Schildknecht...