- Fort Washington PA, US Ray L. Cathcart - New York NY, US Cuong Huynh - Radnor PA, US Deepak Sood - New Britain PA, US Paul W. Sucro - Hatfield PA, US Joseph O. DeAngelo - Winters CA, US
International Classification:
H01L 23/00 B23K 20/00 H01L 21/66
Abstract:
A method of forming a wire loop in connection with a semiconductor package is provided. The method includes the steps of: (1) providing package data related to the semiconductor package to a wire bonding machine; (2) providing at least one looping control value related to a desired wire loop to the wire bonding machine, the at least one looping control value including at least a loop height value related to the desired wire loop; (3) deriving looping parameters, using an algorithm, for forming the desired wire loop; (4) forming a first wire loop on the wire bonding machine using the looping parameters derived in step (3); (5) measuring actual looping control values of the first wire loop formed in step (4) corresponding to the at least one looping control value; and (6) comparing the actual looping control values measured in step (5) to the at least one looping control value provided in step (2).
Systems And Methods For Optimizing Looping Parameters And Looping Trajectories In The Formation Of Wire Loops
- Fort Washington PA, US Ray L. Cathcart - New York NY, US Cuong Huynh - Radnor PA, US Deepak Sood - New Britain PA, US Paul W. Sucro - Hatfield PA, US Joseph O. DeAngelo - Winters CA, US
International Classification:
H01L 23/00 B23K 20/00 H01L 21/66
Abstract:
A method of forming a wire loop in connection with a semiconductor package is provided. The method includes the steps of: (1) providing package data related to the semiconductor package to a wire bonding machine; (2) providing at least one looping control value related to a desired wire loop to the wire bonding machine, the at least one looping control value including at least a loop height value related to the desired wire loop; (3) deriving looping parameters, using an algorithm, for forming the desired wire loop; (4) forming a first wire loop on the wire bonding machine using the looping parameters derived in step (3); (5) measuring actual looping control values of the first wire loop formed in step (4) corresponding to the at least one looping control value; and (6) comparing the actual looping control values measured in step (5) to the at least one looping control value provided in step (2).
Wikipedia References
Joseph James Deangelo
Googleplus
Joseph “Deadzoneneon” Dea...
Joseph Deangelo
Joseph Deangelo
Joseph Deangelo
Youtube
Joe DeAngelo-HD Supply.MP4
HD Supply CEO Joe DeAngelo discusses the strength of the company and t...
Category:
Travel & Events
Uploaded:
22 May, 2010
Duration:
1m 42s
part1.wmv
Joe DeAngelo Graduation Project 2010
Category:
Education
Uploaded:
08 May, 2010
Duration:
5m 32s
Jason's Regular Day
Jason's day is filled with many activities, only a few of which includ...
Category:
Film & Animation
Uploaded:
03 Apr, 2010
Duration:
6m 9s
Cowboy Crunchback, Part 1: The Journey Begins
A wanted cowboy ventures into the wilderness in search of a precious b...
Category:
Film & Animation
Uploaded:
28 Nov, 2009
Duration:
8m 17s
Cowboy Crunchback, Part 2: A Wanted Man
In the continuation of the epic adventures of this strapping lone cowb...
Category:
Film & Animation
Uploaded:
29 Nov, 2009
Duration:
7m 45s
Steve "Max" Drodge performing his magic at Sw...
Fellow Magician Steve "Max" Drodge performing at Swirly's FolliesSwirl...
St. Helena School Bronx NY 1954-1956, St. Raymond School Bronx NY 1956-1957, Saint Thomas Aquinas School Fairfield CT 1957-1963
Community:
Joe Bednar, Rick Preissel, Bill Perrotti, Guillermo Guridi, Michael Mannion, Dennis Ramey, Louis Zitnay, Edward Tulinski, David Power, Frank Dezenzo, John Ryan