Search

Irwin J Weinbaum

age ~88

from Boca Raton, FL

Also known as:
  • Irvin Weinbaum
  • Irwin Weindaum
  • Irwin Kessler
  • Weinbaum Irwin
Phone and address:
7202 Promenade Dr APT 801, Boca Raton, FL 33433
561 395-6589

Irwin Weinbaum Phones & Addresses

  • 7202 Promenade Dr APT 801, Boca Raton, FL 33433 • 561 395-6589
  • East Hampton, NY
  • New York, NY
  • Boston, MA
  • 14 Mohawk Ln, Pomona, NY 10970 • 845 364-9829
  • Palm Beach, FL

Work

  • Company:
    Construction sites inc
    1999
  • Address:
    Pomona NY. PDH classes available at your desk at work or at home.
  • Position:
    President. constructability reviews and professional training for nyspes

Education

  • Degree:
    BCE
  • School / High School:
    CCNY
    1955 to 1958
  • Specialities:
    Civil Engineering

Skills

Contemporary Paintng and Collage • Signature Member

Industries

Civil Engineering

Resumes

Irwin Weinbaum Photo 1

President Constructability Reviews And Professional

view source
Location:
14 Mohawk Ln, Pomona, NY 10970
Industry:
Civil Engineering
Work:
Construction Sites Inc - Pomona NY. PDH classes available at your desk at work or at home. since 1999
President. Constructability reviews and professional training for NYSPEs

Slattery Skanka 1965 - 1999
Vice President

Times Square Subway Improvement Corp 1989 - 1993
President

Polytech University - Brooklyn NY Jan 1990 - Jan 1992
Adjunct Professor
Education:
CCNY 1955 - 1958
BCE, Civil Engineering
Skills:
Contemporary Paintng and Collage
Signature Member

Us Patents

  • Method And System For The Removal And Replacement Of A Bridge

    view source
  • US Patent:
    43015654, Nov 24, 1981
  • Filed:
    Mar 19, 1980
  • Appl. No.:
    6/131827
  • Inventors:
    Irwin Weinbaum - New York NY
  • International Classification:
    E01D 100
  • US Classification:
    14 1
  • Abstract:
    A method and system for the removal and replacement of bridges, for example, steel single-span railway bridges, starts with erecting vertical columns on the existing piers or abutments of the bridge. Cross-beam means are secured to the columns, perpendicular to the length of the bridge. A plurality of jack assemblies are positioned on each cross-beam means, the jacks each acting on a high-strength rod secured to the section of the bridge to be removed. The bridge section is cut away, lifted by the jack assemblies, and then the lifted bridge section is shifted sidewise on the cross-beam means to position it over a parallel track on the intact section of the bridge. The jacks then lower the removed bridge section onto a removal means, such as a railroad car, on the intact section of the bridge. The new section of bridge is then delivered and placed in position in a similar manner.
Name / Title
Company / Classification
Phones & Addresses
Irwin Weinbaum
CONSTRUCTION SITES INC
7202 Promenade Dr #801E, Boca Raton, FL 33433
Irwin Weinbaum
Chief Executive Officer, President
Construction Site Ine
Single-Family House Construction
14 Mohawk Ln, Mount Ivy, NY 10970

Youtube

Irwin Weinbaum introduction to Infrastructure...

100 free construction training videos Next video: Irwin Weinbaum i...

  • Duration:
    3m 37s

Infrastructure Projects Constructing Slurry W...

Classes are suitable for Civil Engineers, Architects, Construction Man...

  • Duration:
    14m 56s

Infrastructure Projects Constructing a Secant...

Infrastructure Projects is a practical course providing a background i...

  • Duration:
    7m 55s

Infrastructure Projects Constructing Precast ...

Precast Building Construction Using precast elements in building con...

  • Duration:
    5m 11s

Infrastructure Projects d Class 2 video 1 d...

Infrastructure Projects is a practical guide providing a background in...

  • Duration:
    9m 44s

Infrastructure Projects Constructing Safe Exc...

Infrastructure Projects is a practical course providing a background i...

  • Duration:
    15m 44s

Get Report for Irwin J Weinbaum from Boca Raton, FL, age ~88
Control profile