Search

Aamer Rehman

age ~60

from Flower Mound, TX

Also known as:
  • Ayesha Rehman
  • Aamer Rehmam
  • Reham Aamer
  • Rehman Aamer

Aamer Rehman Phones & Addresses

  • Flower Mound, TX
  • 1231 Meadow Creek Dr, Irving, TX 75038 • 972 756-6043 • 972 874-2174
  • 4022 Story Rd, Irving, TX 75038 • 972 257-1201
  • Rockford, IL
  • Arlington, TX
  • 2705 Wisdom Creek Dr, Flower Mound, TX 75022 • 210 393-3496

Work

  • Position:
    Machine Operators, Assemblers, and Inspectors Occupations

Education

  • Degree:
    High school graduate or higher

Resumes

Aamer Rehman Photo 1

Aamer Rehman

view source
Location:
Dallas/Fort Worth Area
Industry:
Information Technology and Services
Skills:
Supply Chain
Lean Manufacturing
Program Management
Supply Chain Management
Manufacturing
Process Improvement
Kanban
Change Management
Operational Excellence
Enterprise Software
Business Process
Project Planning
Value Stream Mapping
Strategy
Management
Strategic Planning
Team Leadership
ERP
Six Sigma
Leadership
Cross-functional Team Leadership
Business Process Improvement
Management Consulting
Process Engineering
Solution Architecture
CRM
Business Strategy
Business Analysis
Business Intelligence
Professional Services
SaaS
Consulting
Product Management
Languages:
English
Hindi
Urdu
Aamer Rehman Photo 2

Senior Director

view source
Location:
Dallas, TX
Industry:
Information Technology And Services
Work:
I2 Technologies
Senior Director
Aamer Rehman Photo 3

Aamer Rehman

view source
Location:
3 Kapp Cyn, San Antonio, TX 78258
Industry:
Commercial Real Estate

Us Patents

  • System And Method Providing Levelness Of A Production Schedule

    view source
  • US Patent:
    8533014, Sep 10, 2013
  • Filed:
    May 5, 2010
  • Appl. No.:
    12/774202
  • Inventors:
    Timothy Reed Hayes - McKinney TX, US
    Aamer Rehman - Flower Mound TX, US
    Dale Jay Raar - West Olive MI, US
    Jonathan Bier - Ashland MA, US
  • Assignee:
    JDA Software Group, Inc. - Scottsdale AZ
  • International Classification:
    G06Q 10/00
  • US Classification:
    705 7, 705 8, 705 10, 705 22, 705 28
  • Abstract:
    A system and method is disclosed for providing levelness of a production schedule. The system includes a computer configured to access demand data of one or more items to be processed within a sequence of tasks, access the demand data of the one or more items, calculate one or more time intervals for each of the one or more items, and calculate a weighted average for each of the one or more items. The computer is further configured to calculate a time ratio according to the sequence of tasks by calculating the average of the calculated time intervals and the calculated weighted averages and calculating a minimum ratio of an adjusted time interval for each of the one or more items and the calculated weighted averages. The computer is still further configured to generate a production schedule based on a sequence of tasks having a predetermined calculated time ratio.
  • System And Method For Providing An Intelligent Configuration Rationalization Solution

    view source
  • US Patent:
    8538996, Sep 17, 2013
  • Filed:
    Mar 25, 2008
  • Appl. No.:
    12/055100
  • Inventors:
    Aamer Rehman - Flower Mound TX, US
    Jonathan Bier - Ashland MA, US
    Suriya Ganesan - Irving TX, US
  • Assignee:
    JDA Software Group, Inc. - Scottsdale AZ
  • International Classification:
    G06F 7/00
    G06F 17/30
  • US Classification:
    707795, 707803, 707804, 707809, 705 26, 705 28
  • Abstract:
    A system and method is disclosed for rationalizing configurations associated with one or more products. The system includes a database associated with one or more customers. The system further includes an order analysis system coupled with the database. The order analysis system is capable of rationalizing the differences between configurations of various combinations of options that are stored in the database.
  • System And Method For A Demand Driven Lean Production Control System

    view source
  • US Patent:
    20100082138, Apr 1, 2010
  • Filed:
    Sep 23, 2009
  • Appl. No.:
    12/565415
  • Inventors:
    Timothy R. Hayes - Mckinney TX, US
    Aamer Rehman - Flower Mound TX, US
  • International Classification:
    G06F 17/00
    G06F 3/048
  • US Classification:
    700 99, 700108, 715771
  • Abstract:
    A system is disclosed providing visualization of a production control framework. The system includes a database storing production control data associated with one or more entities and a production control system coupled with the database and configured to model a production control framework of the one or more entities. The production control system includes one or more work centers authorizing one or more tasks for one or more parts and one or more manufacturing processes that produce one or more finished parts using the one or more parts.
  • System And Method For A Demand Driven Lean Production Control System

    view source
  • US Patent:
    20100083160, Apr 1, 2010
  • Filed:
    Sep 23, 2009
  • Appl. No.:
    12/565348
  • Inventors:
    Timothy R. Hayes - Mckinney TX, US
    Aamer Rehman - Flower Mound TX, US
  • International Classification:
    G06F 3/048
  • US Classification:
    715772, 715771
  • Abstract:
    A system and method is disclosed providing visualization of a production control framework. The system includes a storage medium stored therein one or more user interfaces providing a visual representation of one or more graphical elements representing one or more entities, the one or more entities comprising one or more work centers, wherein the one or more work centers each comprise one or more user interfaces. The system further includes a storage medium stored therein a job queue display within the one or more user interfaces and a plurality of tasks for each of a plurality of parts produced by the one or more entities.
  • Intelligent Order Promising

    view source
  • US Patent:
    7065499, Jun 20, 2006
  • Filed:
    Sep 7, 2001
  • Appl. No.:
    09/949378
  • Inventors:
    Vineet Seth - Arlington MA, US
    Aamer Rehman - Flower Mound TX, US
  • Assignee:
    i2 Technologies US, Inc. - Dallas TX
  • International Classification:
    G06Q 30/00
  • US Classification:
    705 26, 705 27
  • Abstract:
    An order promising system () includes a commerce module () that receives a product inquiry from a user. The product inquiry includes a product configuration that includes a product identifier, one or more option values, and the delivery location for the product. The system () also includes one or more inventory engines () that receive the product configuration from the commerce module () and identify one or more products in the inventory of one or more sellers that exactly or partially match the product configuration based on one or more matching rules. The inventory engines () also determine a delivery date for each matching product and communicate the matching products and associated delivery dates to the commerce module (). The commerce module () communicates the matching products and associated delivery dates to the user, receives a request for one of the matching products from the user, and communicates the request to the inventory engine (), which receives the request and commits the requested product to the user.
  • System And Method Providing Levelness Of A Production Schedule

    view source
  • US Patent:
    20150073854, Mar 12, 2015
  • Filed:
    Sep 9, 2013
  • Appl. No.:
    14/021166
  • Inventors:
    - Scottsdale AZ, US
    Aamer Rehman - Flower Mound TX, US
    Dale Jay Raar - West Olive MI, US
    Jonathan Bier - Ashland MA, US
  • International Classification:
    G06Q 10/06
  • US Classification:
    705 726
  • Abstract:
    A system and method are disclosed for providing levelness of a production schedule. The system includes a computer configured to access demand data of one or more items to be processed within a sequence of tasks, access the demand data of the one or more items, calculate one or more time intervals for each of the one or more items, and calculate a weighted average for each of the one or more items. The computer is further configured to calculate a time ratio according to the sequence of tasks by calculating the average of the calculated time intervals and the calculated weighted averages and calculating a minimum ratio of an adjusted time interval for each of the one or more items and the calculated weighted averages. The computer is still further configured to generate a production schedule based on a sequence of tasks having a predetermined calculated time ratio.
Name / Title
Company / Classification
Phones & Addresses
Aamer Rehman
President
GORI ENTERPRISES, LLC
Business Services · Business Services Insurance Agent/Broker
2186 Jackson Keller Rd, San Antonio, TX 78213
160 Leonard St, Lewisville, TX 75057
Aamer Rehman
Director
YELLOWFLOWER INSURANCE GROUP INC
Business Services
2320 Stemmons Trl, Dallas, TX 75220
1756 Vermont Ct, Allen, TX 75013
2303 Bristol Dr, Carrollton, TX 75006
Aamer Rehman
Director, Principal, Managing
FIRST FARMLAND INVESTMENTS, LLC
Closed-End Investment Office
5213 Saint Croix Ct, Richardson, TX 75082
1500 Corporate Cir, Grapevine, TX 76092
2705 Wisdom Dr, Flower Mound, TX 75028
Aamer Rehman
Director
VALUE CHAIN PARTNERS, INC
Whol Hardware
1005 Sweet Grass Trl, Flower Mound, TX 75028
Aamer Rehman
President, Director
ADVANCED INTRANET SYSTEMS INC
1005 Sweet Grass Trl, Flower Mound, TX 75028
1005 Sweet Grass Strails, Flower Mound, TX 75028

Youtube

Aamer Rahman - #BanTheBurka

  • Duration:
    2m 28s

Aamer Rahman (Fear of a Brown Planet) - Rever...

aamerrahman.tumb... Twitter: @aamer_rahman Bookings: bec.sutherland@l...

  • Duration:
    2m 49s

Aamer Rahman - OSAMA BIN LADEN

Recorded at Fear of a Brown Planet's final show in Melbourne, October ...

  • Duration:
    3m 38s

Aamer Rehman Convention Promo

  • Duration:
    28s

Aamer Rahman: Why there are no South Asians o...

  • Duration:
    3m 11s

Aamer Rahman on Iggy Azalea (The Bell House 3...

Aamer Rahman on Iggy Azalea and white people. Read our interview with ...

  • Duration:
    3m 40s

Facebook

Aamer Rehman Photo 4

Aamer Ur Rehman

view source
Aamer Rehman Photo 5

Aamer Rehman

view source
Aamer Rehman Photo 6

Aamer Rehman

view source
Aamer Rehman Photo 7

Aamer Rehman

view source
Aamer Rehman Photo 8

Aamer Rehman

view source
Aamer Rehman Photo 9

Aamer Rehman

view source

Other Social Networks

Aamer Rehman Photo 10

Aamer Rehman Google+

view source
Network:
GooglePlus
31 Jul 2011 Aamer Rehman - Work for better results not for money. Money will follow you. - -

Googleplus

Aamer Rehman Photo 11

Aamer Rehman

Lived:
Dallas, TX
Work:
Kinaxis Inc. - VP - Industry Strategy & Solutions (2011)
JDA Software - VP - Industry Solutions (2009-2011)
I2 Technologies - VP - Manufacturing Solutions (1998-2009)
Education:
University of Wisconsin - Madison - Industrial Engineering, Univesity of Engineering & Technology - Lahore - Electrical Engineering, University of Wisconsin - Madison - Manufacturing Systems Engineering
Aamer Rehman Photo 12

Aamer Rehman

Tagline:
Work for better results not for money. Money will follow you.
Aamer Rehman Photo 13

Aamer Rehman

Plaxo

Aamer Rehman Photo 14

aamer rehman

view source
Dallas, TexasHands-on experience in designing, transforming and managing supply chains; Lean Manufacturing solutions and best practice deployments in the discrete... Hands-on experience in designing, transforming and managing supply chains; Lean Manufacturing solutions and best practice deployments in the discrete industries; Program and sales management

Get Report for Aamer Rehman from Flower Mound, TX, age ~60
Control profile